Warequip was an instrumental supplier in the original set up of the temporary casino site in Melbourne.
The temporary site was operating for about three years whilst the current site today was being built. Warequip was engaged to look at all handling systems right across the casino site, including front of house and back of house systems.
Warequip advised on new electronic trolley technologies and concepts right across the various depts, and streamlined more ergonomic handling designs for trolleys, lifting and transport of both product and people.
Due to the huge nature of both the casino site and the international hotel being constructed, the true volume of equipment, and subsequenst pressure on leadtimes was a challenge for all stakeholders.
Warequip is still today working very closely in providing up to date solutions in food and beverage, housekeeping, general stores and gaming.